Entertainer’s Dream
PRECISION CABINETS
Brentwood, CA
The objective for this kitchen, created by Precision Cabinets working with Fautt Homes, was to create a space that was highly functional yet visually refined. The space acts as the central area for daily living as well as the hub for large-scale entertaining.
Cabinetry from Precision Cabinets was custom built using a combination of frameless and inset construction. Custom paint and stain, leather-wrapped drawer fronts, brass framed drawer boxes and walnut cabinet interiors showcase opulence in the design and reflect the homeowners’ personal style. Thoughtful storage includes a pull-out step ladder and a range of interior fittings from Rev-A-Shelf, including a hidden spice rack.
Along the back wall, a wood hood with Wolf insert in a rich brown stain hangs commandingly over the Wolf gas pro range. Flanking the range area are two larder cabinets that keep things close at hand.
The island is highlighted by a built-in butcherblock countertop with an integrated metal hot plate at one end. A sink and faucet are also located here, along with Miele dishwasher, to aid with prep and cleanup. Tambor details on each end, as well as the knobs, pulls and latch hardware, add a traditional touch.
Along the far wall, a Wolf wall oven and warming drawer are hidden behind doors to enhance the seamless style. A paneled refrigerator and freezer from Sub-Zero are also situated here.
Beyond the kitchen, the butler’s pantry was designed as a fully equipped prep and service area and also houses a full suite of appliances, including a refrigerator, freezer, wine refrigerator, cooktop, warming drawer and ovens.
























